John Kelly Construction Services have been working as a Groundworks subcontractor for Anwyl Homes on their Residential Development Site at St George’s Road, Abergele.
The development site includes over 100 hundred residential properties, which range of 3, 4 and 5 bedroom homes and bungalows. For more details of the types homes and bungalows available follow this link
The works carried out on the site by John Kelly Construction comprise of:
- Groundworks
- Earthworks
- Foundation/Slab Work
- Drainage Works
- Services and Utilities Works
- Paving
- Topsoil
- Reinforced Walling
- Reinforced Fencing
Also during the construction phase, work has been carried out to excavate and install an Attenuation Tank, which covered and area of 320m2 with a volume of 148m3.
Below you can see the progress of the excavation works, the installation of the attenuation tank and various works carried out on site:
Further information regarding this project can be found on the attached case study. Information regarding:
- Contract Value
- Timescale
- Client / Principle Contractor
- Reference
CASE STUDY St George’s, Abergele