- Telephone

Bro Infryn, Glasinfryn

Adra
£946,000
May 2024
12 months
John Kelly Construction Services Limited (JKCS) were appointed to carry out the groundworks and super structure, including the construction of additional off-site car parking area for existing residents. This estate of new build social housing were located in Glasinfryn, and consisted of six two storey and one bungalow.
This project was situated within a populated residential area, therefore it was essential for us to carry out the work with minimal disruption to the local residents, we did this through planning deliveries and work on-site carefully to minimise the disruption.
The scope of works included the following:
- Construction of car parking at the centre of the existing estate, including drainage and SuDs features.
- Excavation to reduced levels, including disposal from site.
- Diversion of existing Welsh water sewer and BT overhead lines.
- Insulated formed concrete raft foundations, including design.
- Supply and fit timber frames, first floors and roof structure, including design and the co-ordination of all crane lifting operations.
- Foul and surface water drainage, including SuDS features and porous surfacing.
- Utilities, including electric, water and BT.
- Design and build tobermore retaining walls.
- Fencing and gates.
- Paving, kerbing and surfacing.
- Topsoiling and landscaping
During the project I dealt with Strategy Manager Lisa Kelly-Roberts and Trainee Site Manager Rhun Williams in coordinating health, safety and environmental managements arrangements for the project. All arrangements by John Kelly Construction Services were of the highest standard with a proactive approach displayed at all times. It was very rare that we had to ask for any documentation such as RAMS or evidence of plant operators competence, such documents were provided whenever there was a change in activities or personnel on site. As mentioned above both Lisa Kelly-Roberts and Rhun Williams made sure the site was run to a high standard.